Get App

Dhwani

"Everyone can learn, but not in the same way. Dhwani will help you learn in your own way."

Download for Mac (Silicon)
Version 0.8.1-beta · Free By downloading and using Dhwani, you agree to its terms and conditions.

Limitless Note Types

A versatile workspace designed to help you organize, learn, and excel in .

Interact

Engaging simulations and interactive tools to explore concepts visually. Interact lets you bring lessons to life with customizable widgets, physics engines, and playful mathematical models.

Interact Meal Planner

Interactive Notes

Experience learning in motion. Interact with live simulations to build deep, intuitive understanding of complex concepts.

Page

Write, annotate, and review knowledge in one calm workspace designed for focused learning.

Capture rich pages with structured notes, math, media, and clean formatting.

Page content editor
Honeycomb
Bee 1
Bee 2
Flower 1
Flower 2
Flower 3
Flower 4

Board

Organize thoughts, connect notes, and build visual mind maps on an infinite canvas.

Create infinite visual boards to organize cards, trace flowcharts, and run visual concepts.

Board editor canvas

Chat with Your Second Brain.

Dhwani gives you the freedom to choose your 2nd brain. Configure premium models like Gemini, OpenAI, and Anthropic, route securely through OpenRouter and DeepSeek, or run models 100% locally and offline with Ollama.

Flexible AI Integration

Whether you need state-of-the-art cloud intelligence for complex reasoning, or want to protect sensitive notes by running locally on your own CPU/GPU, Dhwani has you covered. Switch seamlessly between active models or let the built-in assistant route tasks dynamically.

Compatible AI Models
Gemini
OpenAI
Anthropic
DeepSeek
Ollama
OpenRouter
MiniMax
Kimi
Gemini
Kimi
ChatGPT
Claude
OpenRouter
Ollama
DeepSeek
MiniMax

Projects

Turn notes into structured plans, sequence milestones, and schedule tasks automatically with local AI.

Visualize your project sequence, track milestones, and inspect gantt charts cleanly.

Project timeline showing tasks and scheduling

Unleash Your Creativity with Plugins

Dhwani is now local-first and fully extendable. You have the ultimate power to build custom integrations.

Download Plugin Kit

Get started with our official plugin starter template. Unzip the package to a folder on your local machine; it has all the building blocks to develop your custom plugins.

Download Plugin Kit

Point Your AI Agent

Open the unzipped folder in your environment and tell your AI Coding Agent (e.g. Antigravity) to start building.

AI Coding Agent connected...
To add plugin, go to: Settings > Plugins > Click the "Install Plugin"
Open AI Standard

Supercharge External AI with MCP

Connect your favorite AI assistants—Claude Desktop, Claude Code, Cursor, OpenCode, Windsurf, and ChatGPT / Codex—directly to your local Dhwani workspace.

Local-First Server

Runs locally via Streamable HTTP at 127.0.0.1:8321/mcp. Zero cloud middlemen; your notes stay private on your machine.

Default-On & Ready

Full Two-Way Tooling

External AIs can semantically search, create rich notes, build visual mind maps, query project tasks, read attachments, and generate flashcard decks.

25+ Native MCP Tools

Universal Compatibility

Seamlessly bridges with Anthropic Claude, OpenAI Codex, OpenCode, Antigravity, Cursor, and custom Python/TypeScript LLM agents.

Standard JSON-RPC 2.0
Active Endpoint
http://127.0.0.1:8321/mcp

Streamable HTTP / SSE transport • Dynamic port fallback auto-enabled

Claude Desktop Claude Code Cursor OpenCode Windsurf ChatGPT / Codex
To configure MCP, go to: Settings > MCP > Copy Endpoint URL